Hp Array Controller HSG V8.7 Software Manuale Utente Pagina 76

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
Vedere la pagina 75
222 HSG80 Users Guide
3. Connect the Fibre Channel cable from Port 1 on controller A to Port 9
on hub 1. Repeat this step to connect the second cable from Port 1 on
controller B to Port 8 on hub 1.
4. Connect another Fibre Channel cable from Port 2 on controller A to Port
1 on hub 2. Repeat this step to connect the final cable from Port 2 on
controller B to Port 2 on hub 2.
5. Connect each hub to their respective host according to the instructions
supplied in the Getting Started manual.
6. Route and tie the cables as desired.
7. Restart the I/O from the host. Some operating systems may require you
to restart the host to see the devices attached to the new controller.
Use the following steps and Figure 29 to connect your dual-redundant
controllers to the host using one hub with copper support:
Figure 29 Cabling for Dual-Redundant Configuration with One Hub using Fibre Channel
Optical Support
1 2 3 4 5 6
CXO6497A
3
1
1 2 3 4 5 6
2
To host
Vedere la pagina 75
1 2 ... 71 72 73 74 75 76 77 78 79 80 81 ... 575 576

Commenti su questo manuale

Nessun commento