Hp Array Controller HSG V8.7 Software Manuale Utente Pagina 145

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
  • Pagina
    / 206
  • Indice
  • SEGNALIBRI
  • Valutato. / 5. Basato su recensioni clienti
Vedere la pagina 144
Power Distribution
UltraSCSI RAID Enclosure 6–19
3. Align the ac input box (C
ALLOUT
1) with either slot A or slot B in the
lower
left
or
lower
right corner
of the RAID enclosure, respectively.
4. Push in on the ac input box to fully seat it.
5. Tighten the two retaining screws (C
ALLOUT
2).
6. Connect the ac power cord (C
ALLOUT
4) from the ac power source to
the ac input box (C
ALLOUT
1).
7. If necessary, repeat steps 1 through 6 to install a second ac input box.
8. Turn O
N
each ac input box
by pressing the
I
on the ac
power switch (C
ALLOUT
1).
9. Verify that all power supply status LEDs turn O
N
.
Table 6–6 Installing an AC Input Box (Continued)
1
0
1
0
1
2
3
4
CXO5186B
1
0
CXO5488B
2
1
Vedere la pagina 144
1 2 ... 140 141 142 143 144 145 146 147 148 149 150 ... 205 206

Commenti su questo manuale

Nessun commento