HP D2200sb Manuale Utente Pagina 22

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
Vedere la pagina 21
Setup 22
7.
Install the FBWC module. To avoid possible damage to the storage blade, be sure that the module is
fully seated before installing the screw.
8. Install the FBWC capacitor pack.
9. Close the hard drive drawer.
10. Install the access panel (on page 12).
11. Install the storage blade in the enclosure.
12. Power up the partner server blade. See the server blade documentation.
The capacitor pack is fully charged in approximately 5 minutes. The cache module provides improved
storage blade performance during that time. Data is protected against an unplanned power failure after the
5 minute interval.
Vedere la pagina 21
1 2 ... 17 18 19 20 21 22 23 24 25 26 27 ... 48 49

Commenti su questo manuale

Nessun commento