HP Modular Cooling System Guida di Avvio Rapido Pagina 52

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
  • Pagina
    / 93
  • Indice
  • SEGNALIBRI
  • Valutato. / 5. Basato su recensioni clienti
Vedere la pagina 51
Facility planning for implementation 52
The following figure shows the recommended facility piping approaches to the MCS-200/100.
Item Description
1
Preferred piping location: locate chilled water piping taps
behind the MCS-200/100either under or above the
floor. Chilled water taps must approach laterally.
2
Do not locate piping connections or components under the
MCS-200/100.
3
Alternate piping location: locating chilled water piping
taps in front of the MCS-200/100. Under the floor is
possible. This option requires careful planning due to the
chilled water hose length limitation.
Hose openings
The following figures show the dimensions and locations of the various hose openings of the MCS-200/100.
MCS-100 hose openings
Vedere la pagina 51
1 2 ... 47 48 49 50 51 52 53 54 55 56 57 ... 92 93

Commenti su questo manuale

Nessun commento