HP Data Center Environmental Edge
Hardware Installation Guide
Abstract
This document is for the person who installs, administers, and troubleshoots HP Data Center Environmental Edge systems.
Part Number: 531667-003
April 2011
Edition: 3
Vedere la pagina 0
1 2 3 4 5 6 ... 81 82

Sommario

Pagina 1 - Hardware Installation Guide

HP Data Center Environmental Edge Hardware Installation Guide Abstract This document is for the person who installs, administers, and troubleshoots

Pagina 2

HP Base Station Gateway 10 6. In the navigation menu on left side of the page, select Network. The Network Configuration page appears. NOTE: T

Pagina 3 - Contents

HP Base Station Gateway 11 o Device Status page

Pagina 4 - Contents 4

HP Base Station Gateway 12 o Line 1 Configuration page

Pagina 5

HP Base Station Gateway 13 o Tunnel 1 Serial Settings page

Pagina 6 - Required tools

HP Base Station Gateway 14 o Tunnel 1 Accept Mode page

Pagina 7 - HP Base Station Gateway

HP Base Station Gateway 15 o Tunnel 1 Connect Mode page

Pagina 8

HP Base Station Gateway 16 10. In the navigation menu on the left side of the page, select System. The System page appears. 11. Select Reboot. The

Pagina 9 - HP Base Station Gateway 9

HP Base Station Gateway 17 3. Insert and tighten the antenna to the gateway. 4. Remove the mounting tape liner, and secure the gateway to the desi

Pagina 10

HP Base Station Gateway 18 6. Connect one end of the CAT5 Ethernet cable to the gateway and the other end to your network. 7. Turn on the gateway

Pagina 11 - Device Status page

HP Base Station Gateway 19 o Is solid red if the gateway is not connected to the network or if HP Insight Environmental Observer application is not

Pagina 12 - Line 1 Configuration page

© Copyright 2009, 2011 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice. The only warr

Pagina 13 - HP Base Station Gateway 13

HP Environmental Base Station installed on a rack 20 HP Environmental Base Station installed on a rack Overview: Installing a base station on a rack

Pagina 14 - Tunnel 1 Accept Mode page

HP Environmental Base Station installed on a rack 21 o The HP Rack Sensor Array has the Front (Cold) Side label and the Rear (Hot) Side label, indic

Pagina 15 - Tunnel 1 Connect Mode page

HP Environmental Base Station installed on a rack 22 5. Remove the mounting tape liner and attach the cable restraint brackets near the door hing

Pagina 16

HP Environmental Base Station installed on a rack 23 NOTE: You can install the base station outside or inside of the top of the rack. 1. Ensur

Pagina 17 - HP Base Station Gateway 17

HP Environmental Base Station installed on a rack 24 Installation is complete.

Pagina 18 - Gateway LED status

HP Environmental Base Station installed on a CRAH/CRAC 25 HP Environmental Base Station installed on a CRAH/CRAC Overview: Installing a base station

Pagina 19 - • Active LED

HP Environmental Base Station installed on a CRAH/CRAC 26 2. Verify that you are installing the correct sensor string to the correct location in the

Pagina 20

HP Environmental Base Station installed on a CRAH/CRAC 27 HP recommends using cable tie wraps to secure the base station to an available support bra

Pagina 21

HP Environmental Base Station installed on a CRAH/CRAC 28 Callout Component Description and humidity. Installing the HP Environmental CRAH/CRAC

Pagina 22

HP Environmental Base Station installed on a CRAH/CRAC 29 WARNING: The CRAH/CRAC must be powered down and the fans must be stopped before you acce

Pagina 23

Contents 3 Contents HP Data Center Environmental Edge hardware overview ... 5 Recomm

Pagina 24 - Installation is complete

HP Environmental Base Station installed on a CRAH/CRAC 30 Dual CRAH installation diagram Callout Component Description 1 CRAH return air stream

Pagina 25 - CRAH/CRAC

HP Air Pressure Base Station 31 HP Air Pressure Base Station Overview: Air Pressure Base Station The air pressure base station is a wireless device

Pagina 26

HP Air Pressure Base Station 32 c. Route the air tube to the area below the floor that you want to monitor. d. Use cable tie wraps to secure the ai

Pagina 27

HP Air Pressure Base Station 33 o If there is a location behind and under a rack near subfloor access, use the double-sided mounting tape to secure

Pagina 28 - Base Station

(Optional) Sensor Base Stations 34 (Optional) Sensor Base Stations Overview: (Optional) Sensor base stations The optional sensor base stations enabl

Pagina 29

(Optional) Sensor Base Stations 35 2. Remove the mounting tape liner, and secure the base station to the desired location on the top of the rack. 3

Pagina 30

(Optional) Sensor Base Stations 36 d. Insert the connector from the Door Position Base Station wire harness into the Door Position Base Station. 5.

Pagina 31 - HP Air Pressure Base Station

(Optional) Sensor Base Stations 37 b. If a support bracket is available, use cable ties to secure the housing box to the support bracket. 2. Route

Pagina 32

(Optional) Sensor Base Stations 38 Single Chilled Water installation diagram Callout Component 1 Chilled Water Energy Base Station 2 Water supply

Pagina 33

(Optional) Sensor Base Stations 39 1. Connect a USB connector from the PC to the USB configuration port on the inside of the Chilled Water Base Stat

Pagina 34

Contents 4 Verifying gateway communication ... 72 Ve

Pagina 35

(Optional) Sensor Base Stations 40 If a red OFFLINE error appears, select Communications>Initialize, and then re-enter the appropriate COM port.

Pagina 36

(Optional) Sensor Base Stations 41 5. To configure the Chilled Water Base Station, select Configuration. The System Configuration window appears. 6

Pagina 37

(Optional) Sensor Base Stations 42 o Fluid—Select the type of water. 7. Select the Flow tab, and configure the following parameters: o Flow rate

Pagina 38

(Optional) Sensor Base Stations 43 8. Select the Output tab, and configure the following parameters: o Module #1—Select the volumetric flow and e

Pagina 39

(Optional) Sensor Base Stations 44 o Flow at 20mA (Max flow)—Select the maximum flow rate. This must match the parameters set on the Flow tab.

Pagina 40 - COM port

(Optional) Sensor Base Stations 45 9. Select the Basic tab, and then select Download to transfer the new settings into the Chilled Water Base Statio

Pagina 41

(Optional) Sensor Base Stations 46 The flow at 4mA is 0 l/s and the flow at 20mA is 30 l/s. If the Test field is set to 4, then the flow rate on the

Pagina 42

(Optional) Sensor Base Stations 47 2. If a support bracket is available, use cable ties to secure both the base station (1) and the water leak detec

Pagina 43 - Flow tab

(Optional) Sensor Base Stations 48 k. Replace the Water Leak Detector lid, and use the supplied Allen wrench to tighten the two screws to secure the

Pagina 44

(Optional) Sensor Base Stations 49 Water Leak Detector installation diagram Callout Component Description 1 AC adapter Plugs into a power sourc

Pagina 45 - Testing the configuration

HP Data Center Environmental Edge hardware overview 5 HP Data Center Environmental Edge hardware overview Recommended base configuration HP recommen

Pagina 46

(Optional) Sensor Base Stations 50 a. If a flat surface is available, remove the mounting tape liner and secure the base station to the surface. b.

Pagina 47

(Optional) Sensor Base Stations 51 c. Using a flathead screwdriver, secure the black wire to the negative terminal block on the current sensor trans

Pagina 48

(Optional) Sensor Base Stations 52 a. If a flat surface is available, remove the mounting tape liner and secure the base station to the surface. b.

Pagina 49

(Optional) Sensor Base Stations 53 c. Using a flathead screwdriver, secure the black wire to the negative terminal block on the current sensor trans

Pagina 50

(Optional) Sensor Base Stations 54 Installation is complete. 200A Current installation diagram Callout Component Description 1 Power device Any

Pagina 51

(Optional) Sensor Base Stations 55 1. Choose the location for the Energy Base Station, relative to your energy meter. 2. Connect the Energy Base St

Pagina 52

(Optional) Sensor Base Stations 56 o RS-485 (-): Pin 4 (RJ-45 connector) to Pin 3 (RS-232 connector) Callout Component Description 1 RJ-45 Ether

Pagina 53

(Optional) Sensor Base Stations 57 Energy Base Station installation diagram Callout Component Description 1 Energy meter Energy meter(with hous

Pagina 54

(Optional) Sensor Base Stations 58 4. Press and hold the UP and DOWN arrows simultaneously for a minimum of 2 seconds to exit. Programming the vol

Pagina 55

(Optional) Sensor Base Stations 59 • Ct1 = 200 • Ct2 = 5 Programming the digital out 1. Set the following values. Digital out ION setting out1

Pagina 56

HP Data Center Environmental Edge hardware overview 6 Required tools The following items are required for installation: • HP Environmental Edge Ins

Pagina 57

(Optional) Sensor Base Stations 60 2. Set the device unit ID to a number value between 1 and 32. If multiple meters are connected in a daisy chain s

Pagina 58 - Programming the CT model

(Optional) Sensor Base Stations 61 4. Set the power scale (PPS) to 10x. Configuring the Modbus Base Station 1. Go to the Comtrol website (http://

Pagina 59 - Programming the Modbus ID

(Optional) Sensor Base Stations 62 The Scan results appear. 3. Right-click the Modbus base station you want to configure and select Web Manager.

Pagina 60

(Optional) Sensor Base Stations 63 The main Comtrol Web Manager main page appears. 4. Configure the device network settings.

Pagina 61

(Optional) Sensor Base Stations 64 a. From the main page, select Configure Network. The Edit Network Configuration page appears. b. Enter the IP a

Pagina 62 - The Scan results appear

(Optional) Sensor Base Stations 65 a. From the main page, select Serial Device Configuration. The Serial Device Configuration page appears.

Pagina 63

(Optional) Sensor Base Stations 66 b. Select Port 1 to change the serial port settings. c. On the Mode menu, select RS-485. NOTE: The baud ra

Pagina 64 - Select Save

(Optional) Sensor Base Stations 67 a. From the main page, select Ethernet Device Configuration. The Ethernet Device Configuration page appears.

Pagina 65

(Optional) Sensor Base Stations 68 b. Select Socket 1. The Edit Socket Port 1 Configuration page appears.

Pagina 66

(Optional) Sensor Base Stations 69 7. From the main page, select Reboot to update all new configurations.

Pagina 67

HP Base Station Gateway 7 HP Base Station Gateway Overview: Gateway The gateway collects information from all wireless base stations within a wirele

Pagina 68

Power up procedure 70 Power up procedure Powering up the components 1. Verify that the gateway is connected to the power and is working in operatio

Pagina 69

Power up procedure 71 1. During the initial power up mode and after the initial bootup LED sequence, the LED on the base station flashes red while a

Pagina 70 - Power up procedure

Troubleshooting 72 Troubleshooting HP Insight Environmental troubleshooting tips To troubleshoot communication issues: 1. Turn off all of the wirel

Pagina 71

Troubleshooting 73 Use the following flow chart to help troubleshoot gateway communication errors and determine whether you must replace the gateway

Pagina 72 - Troubleshooting

Troubleshooting 74 • Network card on the Edge server • Network switch between the Edge server and the gateway Verifying HP Water Leak Detection B

Pagina 73 - Verifying network settings

Troubleshooting 75 Verifying the CT shorting block position If the CT values for your ION power meter all appear to be zero, a CT shorting block mig

Pagina 74

Regulatory compliance notices 76 Regulatory compliance notices Wireless devices You can install one or more integrated wireless devices. In some env

Pagina 75 - Troubleshooting 75

Regulatory compliance notices 77 European Union regulatory notice Products bearing the CE marking comply with the following EU Directives: • Low Vo

Pagina 76 - Canadian notices

Regulatory compliance notices 78 The point of contact for regulatory matters is Hewlett-Packard GmbH, Dept./MS: HQ-TRE, Herrenberger Strasse 140, 71

Pagina 77 - • EMC Directive 2004/108/EC

Regulatory compliance notices 79 For more information about battery replacement or proper disposal, contact an authorized reseller or an authorized

Pagina 78 - Taiwan notices

HP Base Station Gateway 8 3. Configure the IP address of the computer to a temporary static address such as 192.168.0.10. NOTE: You only need

Pagina 79

Acronyms and abbreviations 80 Acronyms and abbreviations CRAC computer room air conditioning CRAH computer room air handler CT current transducer

Pagina 80 - Acronyms and abbreviations

Index 81 A air pressure base station, installation 31 air pressure base station, overview 31 B base configuration 5 base station, CRAH/CRAC ov

Pagina 81 - Index 81

Index 82 M Modbus Base Station, configuring 61 modifications, FCC notice 76 N network settings 73 notices 2 O overview 5 P power cycle gat

Pagina 82 - Index 82

HP Base Station Gateway 9 o The default password is PASS.