Hp DL380 G7 Manuale Utente Pagina 30

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
Vedere la pagina 29
Operations 30
4. Install the PCI riser cage.
5. Install the access panel (on page 26).
6. Install the server into the rack ("Installing the server into the rack" on page 35).
7. Power up the server (on page 24).
Install the full-length expansion board retainer
1. Power down the server (on page 24).
2. Extend the server from the rack (on page 24).
3. Remove the access panel (on page 25).
4. Install the PCI riser cage (on page 29).
5. Install the full-length expansion board retainer.
6. Install the access panel (on page 26).
Vedere la pagina 29
1 2 ... 25 26 27 28 29 30 31 32 33 34 35 ... 125 126

Commenti su questo manuale

Nessun commento