Hp ProLiant ML570 G4 Server Manuale Utente Pagina 61

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
Vedere la pagina 60
Hardware options installation 61
d.
Repeat for the right plastic clip.
14. Connect the power cable from the server to the tape drive.
15. Connect one end of the data cable to the tape drive and thread the other end into the server through
the tape drive bay.
NOTE: The appropriate cables should ship in the individual option kits or with the device being installed.
IMPORTANT: Route the USB cable under the mid fan cage.
16. Slide the tape drive into the bay until it is seated securely.
17. Connect the power and data cables ("System board components" on page 11).
18. Install the system board.
19. Install the memory cage.
20. Install the memory boards ("Removing and installing a memory board (hot-plug)" on page 48,
"Removing and installing a memory board (non-hot-plug)" on page 51).
21. Install any expansion boards ("Installing expansion boards" on page 66).
22. Install the center wall.
Vedere la pagina 60
1 2 ... 56 57 58 59 60 61 62 63 64 65 66 ... 124 125

Commenti su questo manuale

Nessun commento