Hp ProLiant DL380 G7 Server Manuale Utente Pagina 57

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
Vedere la pagina 56
Hardware options installation 57
10.
Attach the capacitor pack to the air baffle.
11. Install the PCI riser cage (on page 29).
12. Install the full-length expansion board retainer (on page 30) if any full-length expansion boards are
installed.
13. Install the access panel (on page 26).
14. Install the server into the rack ("Installing the server into the rack" on page 35).
15. Power up the server (on page 24).
Optical drive option
1. Power down the server (on page 24).
2. Extend the server from the rack (on page 24).
3. Remove the access panel (on page 25).
Vedere la pagina 56
1 2 ... 52 53 54 55 56 57 58 59 60 61 62 ... 126 127

Commenti su questo manuale

Nessun commento